Con más de 30 descubrimientos realizados en la costa de Guyana, ExxonMobil tiene una línea de visión clara para la adición de seis buques flotantes de producción, almacenamiento y descarga (FPSO) para el 2027 en el Bloque Stabroek , donde se estima que la producción de petróleo supere los 1,2 MM bpd, donde ExxonMobil tiene el 45% (operadora), Hess 30% y CNOOC 25% .
Liza Phase 1
Field(s): Liza
Resource: 450 million barrels of oil equivalent
Development wells: 17
First Oil: December 2019
Oil Production Capacity: 150,000 bpd
FPSO Oil Storage Capacity: 1.6 million barrels
Offloading Frequency: Every 5 – 10 days
Estimated Development Cost: US$3.6 billion
Liza Phase 2
Field(s): Liza
Resource: 600 million barrels of oil equivalent
Development wells: 33
First Oil: February 2022
Oil Production Capacity: 230,000 bpd
FPSO Oil Storage Capacity: 2 million barrels
Offloading Frequency: Every 4 days
Estimated Development Cost: US$6 billion
Payara
Field(s): Payara, Pacora
Resource: 600 million barrels of oil equivalent
Development wells: 35 – 45
First Oil: 2023 (Expected)
Oil Production Capacity: 220,000 bpd
FPSO Oil Storage Capacity: 2 million barrels
Offloading Frequency: Every 4 days
Estimated Development Cost: US$9 billion
Yellowtail
Field(s): Yellowtail, Redtail
Resource: 925 million barrels of oil equivalent
Development wells: 45 – 55
First Oil: 2025 (Expected)
Oil Production Capacity: 250,000 bpd
FPSO Oil Storage Capacity: 2 million barrels
Offloading Frequency: Every 4 days
Estimated Development Cost: US$10 billion
Uaru
Field(s): Uaru, Mako, Snoek
Resource: ~1.3 billion barrels of oil equivalent
Development wells: 40 – 76
First Oil: 2026 (Expected)
Oil Production Capacity: 220,000 – 275,000 bpd
FPSO Oil Storage Capacity: 2 million barrels
Offloading Frequency: Every 4 days
Estimated Development Cost: US$12.7 billion
Whiptail
Field(s): Whiptail, Pinktail, Tilapia
Resource: ~1 billion barrels of oil equivalent
Development wells: 40 – 65
First Oil: Late 2027 – Early 2028
Oil Production Capacity: 220,000 – 275,000 bpd
FPSO Oil Storage Capacity: 2 million barrels
Offloading Frequency: Approximately every 3-6 days
Estimated Development Cost: TBA
Ese titulo se debe corregir, debería ser “Cronología de los proyectos de desarrollo de Exxon en Guyana y Venezuela” porque no existe delimitación de la plataforma continental sobre el Atlantico entre Guyana y Venezuela a causa del litigio sobre el territorio Esequibo, de hecho muchos de esos bloques tal como se ven en el mapa alcanzan el frente de las costas del estado venezolano de Delta Amacuro, ya algo lejos de Guyana… parece que el litigio de Venezuela no será con Guyana sino con la EXXON…